In NEC3 ECC there is a requirement for the Contractor to show on each submitted programme both float and time risk allowance. Is there a feeling these terms are generally understood and if not, apart from why not (!), what more can be done to help?
Showing posts with label float. Show all posts
Showing posts with label float. Show all posts
Thursday, 4 July 2013
Subscribe to:
Posts (Atom)